Skip to form

City of Bonney Lake-Permit Center

permit@bonneylake.gov

21719 96th St E Second Floor Buckley, WA 98321

253-447-4356

Accessory Dwelling Unit (ADU): Building Permit Application

SITE AND PROJECT DATA

Is the Proposed ADU:

Job Site Address:

If the zoning for the property is R-1 or RC-5, is the lot size greater than 10,000 square feet?

Flood Plain:

Sewage disposal:

If the property is on septic, the City of Bonney Lake will require proof of application to the Tacoma Pierce County Health Department at the time of ADU application submittal.

Grinder Pump:

Property Owner

Mailing Address

Is the Applicant someone other than the property owner?

Applicant Full Name

Applicant Mailing Address

Is there a separate contact for this project?

Project Contact Person:

Contractor Address

BUILDING DATA

Total Number of:

Proposed Floor Area (sq. footage) for Additions and New Accessory Dwelling Units:

Existing Structures Floor Area (sq. footage) for Additions and Remodels:

Construction method:

Heating System:

Propane:

Lawn Sprinkler with Backflow:

Fire Sprinkler:

UPLOAD DOCUMENTS

All required review documents shall be uploaded into this application via the Click Here to Upload link below prior to submittal. If no documents are uploaded, the Permit Center will require a new application to be submitted with the required documents uploaded.

Upload Documents and Plans (1-10):

Click Here to Upload

Additional Documents to Upload (11-20):

Click Here to Upload

CERTIFICATION

Sign Here

Choose how to sign

Signer:

For the City of Bonney Lake to consider your building permit application complete, the applicant or agent must also provide a water connection application if you are within our water service area, if not we require a certificate of water/fire flow availability; a sewer permit application if within our sewer service area, if not a septic design approval from Pierce County Health Department; road approach application; and a land clearing application if necessary.  All new single family residences are required to have a fire sprinkler system, this application may be deferred.  Traffic and Park Impact fees must be paid at the time of permit issuance.